Today they waterproofed the walls (that's the black coating you see in the pictures), put the heat coils in the ground and stubbed the piping into the basement for the geothermal, did the underground piping for the plumbing and backfilled with rock to prepare for pouring the basement floor today. See pictures below.
Friday, December 21, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment